Task id |
Title |
Deliverable(s) |
Responsible(s) * |
Start date |
Monitoring *** |
|||
Status |
Reason |
PPY |
Main Contributors |
|||||
ITM-05-IMP3-T1-A |
Identification of existing equilibrium modules (in conjunction with IMP1). |
Documentation of pieces of code in existing transport codes that could be turned into ITM equilibrium modules. |
G. Pereverzev
|
01/07/2005 31/09/2005 |
|
|
|
|
ITM-05-IMP3-T1-B |
Formation of working groups (in conjunction with IMP1). |
Creation of functioning working groups |
G. Pereverzev
|
01/08/2005 31/12/2005 |
|
|
|
|
ITM-05-IMP3-T1-C |
Preparation of standardised interfaces (in conjunction with IMP1 and ISIP). |
Version 1 of the standard interface for each physics module |
G. Pereverzev
|
01/08/2006 31/03/2006 |
|
|
|
|
ITM-05-IMP3-T1-D |
Preparation of equilibrium modules by extraction from existing codes (in conjunction with IMP1). |
Various equilibrium physics modules that could be used by the CPP or by existing transport codes. |
G. Pereverzev
|
01/01/2006 31/12/2006 |
|
|
|
|
ITM-05-IMP3-T1-E |
Implementation of prepared equilibrium modules (in conjunction with IMP1). |
Implementation of modules in CPP or existing transport codes (from the above process or from other IMP’s). |
G. Pereverzev
|
01/04/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T1-F |
Documentation / verification / validation /benchmarking (in conjunction with IMP1) |
Certifications of the various equilibrium modules. |
G. Pereverzev
|
01/01/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T2-A |
Identification of existing non-linear modules (in conjunction with IMP2). |
Documentation of pieces of code in existing transport codes that could be turned into ITM non-linear modules. |
V. Parail
|
01/07/2005 31/09/2005 |
|
|
|
|
ITM-05-IMP3-T2-B |
Formation of working groups (in conjunction with IMP2). |
Creation of functioning working groups |
V. Parail
|
01/08/2005 31/12/2005 |
|
|
|
|
ITM-05-IMP3-T2-C |
Preparation of standardised interfaces (in conjunction with IMP2 and ISIP). |
Version 1 of the standard interface for each physics module |
V. Parail
|
01/08/2006 31/03/2006 |
|
|
|
|
ITM-05-IMP3-T2-D |
Preparation of non-linear modules by extraction from existing codes (in conjunction with IMP2). |
Various non-linear physics modules that could be used by the CPP or by existing transport codes. |
V. Parail
|
01/01/2006 31/12/2006 |
|
|
|
|
ITM-05-IMP3-T2-E |
Implementation of prepared non-linear modules (in conjunction with IMP2). |
Implementation of modules in CPP or existing transport codes (from the above process or from other IMP’s). |
V. Parail
|
01/04/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T2-F |
Documentation / verification / validation /benchmarking (in conjunction with IMP2) |
Certifications of the various non-linear modules. |
V. Parail |
01/01/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T3-A |
Identification of existing transport modules (in conjunction with IMP4). |
Documentation of pieces of code in existing transport codes that could be turned into ITM transport modules. |
D. Kalupin
|
01/07/2005 31/09/2005 |
ready |
|
|
|
ITM-05-IMP3-T3-B |
Formation of working groups (in conjunction with IMP4). |
Creation of functioning working groups |
D. Kalupin
|
01/08/2005 31/12/2005 |
In progress |
|
|
|
ITM-05-IMP3-T3-C |
Preparation
of transport modules by extraction from existing codes. |
Various
transport physics modules that could be used by the ISIP or by existing
transport codes. |
D. Kalupin
|
01/08/2006 31/03/2006 |
Almost done |
0.2 |
P.Strand, D.Kalupin |
|
ITM-05-IMP3-T3-D |
Preparation
of standardised interfaces (in conjunction with IMP4 and ISIP). |
Implementation
of modules in ISIP or existing transport codes (from the above process
or from other IMP’s). |
D. Kalupin
|
01/01/2006 31/12/2006 |
Almost done |
0.2 |
P.Strand, G.Corrigan, D.Kalupin |
|
ITM-05-IMP3-T3-E |
Documentation
/ verification / validation /benchmarking (in conjunction with IMP4). |
Certifications
of the various transport modules. |
D. Kalupin
|
01/04/2006 31/12/2007 |
Not ready |
1.0 – 2.0 |
C.Angioni, F.Imbeaux, D.Kalupin, V.Parail, G.Pereverzev, B.Scott, P.Strand |
|
ITM-05-IMP3-T3-F |
Implementation
of prepared transport modules (in conjunction with IMP4 and ISIP). |
Implementation
of modules in ISIP or existing transport codes (from the above process
or from other IMP’s). |
D. Kalupin |
01/01/2006 31/12/2007 |
Not ready |
Waits
for the code |
0.2 |
P.Strand, D.Kalupin |
ITM-05-IMP3-T4-A |
Identification of existing source modules (in conjunction with IMP5). |
Documentation of pieces of code in existing transport codes that could be turned into ITM source modules. |
V. Basiuk
|
01/07/2005 31/09/2005 |
|
|
|
|
ITM-05-IMP3-T4-B |
Formation of working groups(in conjunction with IMP5). |
Creation of functioning working groups |
V. Basiuk
|
01/08/2005 31/12/2005 |
|
|
|
|
ITM-05-IMP3-T4-C |
Preparation of standardised interfaces(in conjunction with IMP5 and ISIP). |
Version 1 of the standard interface for each physics module |
V. Basiuk
|
01/08/2006 31/03/2006 |
|
|
|
|
ITM-05-IMP3-T4-D |
Preparation of source modules by extraction from existing codes(in conjunction with IMP5). |
Various source physics modules that could be used by the CPP or by existing transport codes. |
V. Basiuk
|
01/01/2006 31/12/2006 |
|
|
|
|
ITM-05-IMP3-T4-E |
Implementation of prepared source modules(in conjunction with IMP5). |
Implementation of modules in CPP or existing transport codes (from the above process or from other IMP’s). |
V. Basiuk
|
01/04/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T4-F |
Documentation / verification / validation /benchmarking(in conjunction with IMP5) |
Certifications of the various source modules. |
V. Basiuk
|
01/01/2006 31/12/2007 |
|
|
|
|
ITM-05-IMP3-T5-A |
Identification of existing edge-core modules. |
Documentation of pieces of code in existing transport codes that could be turned into ITM edge-core modules. |
D. Coster
|
01/07/2005 31/09/2005 |
Preliminary work completed |
0..05 |
Coster, Bonnin, Wiesen, Corrigan |
|
ITM-05-IMP3-T5-B |
Formation of working groups. |
Creation of functioning working groups |
D. Coster
|
01/08/2005 31/12/2005 |
Supposed to be tackled by Innsbruck/Ljublana --- held up by funding issues |
|||
ITM-05-IMP3-T5-C |
Preparation of standardised interfaces (in conjunction with ISIP). |
Version 1 of the standard interface for each physics module |
D. Coster
|
01/08/2006 31/03/2006 |
Should be done by 2007-04 |
|||
ITM-05-IMP3-T5-D |
Preparation of edge-core modules by extraction from existing codes. |
Various edge-core physics modules that could be used by the CPP or by existing transport codes. |
D. Coster
|
01/01/2006 31/12/2006 |
Not started |
|||
ITM-05-IMP3-T5-E |
Implementation of prepared edge-core modules. |
Implementation of modules in CPP or existing transport codes (from the above process or from other IMP’s). |
D. Coster
|
01/04/2006 31/12/2007 |
Not started |
|||
ITM-05-IMP3-T5-F |
Documentation / verification / validation /benchmarking |
Certifications of the various edge-core modules. |
D. Coster
|
01/01/2006 31/12/2007 |
Not started |
|||
ITM-07-IMP3-T1 |
Whole device modelling |
(i) Report outlining existing resources (after 3 months); (iia) Delivery of the first (simple) tool for Whole Device Modelling (after 9 months) (iib) Delivery of a more comprehensive tool (or tools) for Whole Device Modelling (after 18 months) (iii) Report outlining the resources required for the development of more comprehensive tools (after 6 months; i.e. 3 months after Deliverable #1) (iv) To be determined on the basis of deliverable #3 |
D. Coster
|
|
|
|
|
|