Timeline
This ISIP timeline for 2010 was prepared by F. Imbeaux and G. Manduchi.
In 2009, we have for the first time assembled a complete version of the
platform, from reading experimental data, actor
generation and management, to
robust workflows including time evolution.
In 2010, ISIP needs to expand the functionality of these tools and upgrade
them in a coordinated way with the needs of the IMPs.
Milestone for 2010 (expected for July) : full set of tools operational
including visualisation tools, link to the simulation catalogue and
operability of Kepler actors on GRID & HPC
We propose the following timeline :
- March:
- Deliver the second version of Kepler (in ITM numbering) : new
features : improved « expression » actors, semantic type checking, Matlab
actor ->DONE
- Debugging procedure in Kepler ->DONE
- Batch and MPI modes for ITM Kepler actors (FC2K )
->DONE
- Deliver ISE ->DONE
- April:
- Deliver data structure 4.08a, with many additions from IMPs (new CPOs )
->DONE
- Collect requirements of IMPs on Visit
- Finalised tool for visualisation (Matplotlib)
- May:
- Add Visit Kepler Actor (composite version) to the public Kepler distribution
- Finalised release of the ITM control toolbox (link between Scicos and Kepler)
- Evaluate strategy for parallel I/O for the UAL
- June:
- Deliver requirements for simulation catalogue querying tool
- Implement the possibility of arrays of structures in the UAL and data structure
- Technical meeting with the Kepler team
- Deliver web service actor and grid/HPC actor generators : WS2K and HPC2K
- July:
- Add automated generation of "remote" UAL to the UAL distribution
- New data structure version with Visit representation tags
- Deliver "newcomer ITM platform User Guide"
- Implement full link with database through the UAL in workflows : UALinit,
UALcollector communicate with the simulation catalogue (technically : change CPO
definition for Kepler, change in FC2K)
- Memory caching activated in Kepler workflows (running on a single node)
(technically : changes on UAL, UALinit, UALcollector)
- September:
- Improved code parameter edition forms in ISE/Kepler
- October:
- ITM control toolbox : deliver link between Simulink and Kepler
- Memory caching in Kepler workflows (memory shared by multiple nodes on the
Gateway )
- November:
- Launch a full ITM workflow on GRID
- Deliver simulation catalogue querying tool
- Merge HPC2K, WS2K and FC2K into a unified tool
- Visit for visualisation of time dependence
last update: 2010-08-24 by konz